Showing posts with label BalloonSat ARHAB construction link line split ring. Show all posts
Showing posts with label BalloonSat ARHAB construction link line split ring. Show all posts
Saturday, August 8, 2009
BalloonSat Link Lines
To keep BalloonSats from slipping down their link lines, tie knots in them and connect split rings through the knots. That way there is no force tugging on the BalloonSat. They're free to slide around on the link lines. If you physically restrain the BalloonSat, then the post-burst chaos could rip them apart or otherwise damage them.
Subscribe to:
Posts (Atom)
